Turbine Long Life Fan Motor Shaft

  • Turbine Long Life Fan Motor Shaft
  • Turbine Long Life Fan Motor Shaft
Turbine Long Life Fan Motor Shaft
  • HHF
  • China
  • 2 months
  • 200pcs per month

We buy steel ingot from Baotou Iron & Steel (Group) Co. LTD, Xingcheng Special Steel and Chengde jiankong Special Steel, who produce high-quality steel ingot. We have 18 years experience and have ability to meet customers’ any needs. We provide the lowest price and the highest quality, also, we have two years guarantee period. We have a level 2 lab.

Product Introduction

We commonly use 45# and 35# carbon steels, but can adjust the grade to match your application.

Fan motor shaft


turbine long life shaft


Fan motor shaft


Chemical Compososition (m%)

Grade CSiMnCrMoPSNi
C450.42-0.50≤0.400.50-0.80≤0.40≤0.10≤0.045≤0.045≤0.40


Mechanical Property

Grade Tensile Strength Rm(MPa)Yield Strength Rp 0.2 (MPa)Elongation A(%)Reduction Area Z(%)Charpy V Impact A (J)Hardness HBW
C45≥600≥355≥16≥40≥39≤229

If your project requires different standards (e.g., alloy steel or custom heat treatment), we can adjust the material and process accordingly.


We manufacture turbine fan motor shafts using high-grade forged steel sourced directly from Baotou Iron & Steel, Xingcheng Special Steel, and Chengde Jiankong Special Steel. These mills are known for consistent chemistry and clean steel structure, which is critical for rotating components under continuous load.

With nearly 20 years of forging experience, we supply these shafts to wind power, mining, and heavy equipment manufacturers worldwide, including Joy Global, Komatsu, and Caterpillar.

Our deep industry experience translates into a unique capability to handle complex, specialized, and high-volume orders. We pride ourselves on our flexibility and are fully equipped to customize our offerings to meet the precise and varied needs of our global clientele.

Operating the National Class II Laboratory certified in-house and providing us with an essential function in the process of quality control. This is where we do the testing of the elements of the chemical composition, mechanical properties, and non-destructive tests for all stages and phases of a product in the most strict manner, in a real-time situation without stopping the production process.


Manufacturing & Capacity

In‍‌‍‍‌ addition, Henan Zhongyuan Heavy Forging Co., Ltd. (HHF) has built an in-depth understanding and rich experience of nearly twenty years in the field of heavy-duty forging by accumulating technical know-how since it was founded in 2006.


The factory's floor space totals about 150 mu (equal to about 100,000 square meters). Besides three extensive open-die forging production lines with 10,000-ton hydraulic presses as core equipment, two state-of-the-art die forging production lines also work, and they are accompanied by large-capacity CNC machining centres, the necessary heat treatment lines, and the top-ranking national class II laboratory. The annual production capacity is up to 50,000 tons of large open-die and dies forgings (including pieces that single weights are over 30 tons).


Approximately 500 people work for the company at the moment, among them, at least 50 people are the R&D team that concentrates on new technologies, materials, and new processes development. The R&D team is composed of senior engineers and technologists.


Among the quality management system supports are numerous certifications, including the American API Q1 standard, API 7-1 licensing for drill stabilizers and drill collars, CSSC system approval, and international recognition for example ISO 9001:2008 and ISO/TS ‍‌‍‍‌29001.


For‍‌‍‍‌ years, the company has been supplying forged parts as the primary material to big companies at home as well as internationally. Different industries such as energy (wind, hydro, and thermal power), mining machines, shipbuilding, and heavy equipment are the company’s customers. Some big Chinese companies like CITIC Heavy Industries, China First Heavy Industries, Taiyuan Heavy Industry, Goldwind, and Envision Energy are the customers, and there are also clients overseas, like Joy Global, Komatsu, and Caterpillar.


Company exportation of these products continues and it goes beyond 20 countries and regions. The major buyers are Germany, the USA, Australia, India, Russia, Brazil, South Africa, South Korea, and ‍‌‍‍‌Japan.


turbine long life shaft


Logistics & Delivery

We support flexible delivery models:

Port delivery (Shanghai, Ningbo, Tianjin, Qingdao, Guangzhou)

Factory container loading – packed and loaded directly at our plant for better handling control

We work with your forwarder or ours, and adapt to your Incoterms, schedule, and packaging requirements

Our goal is to make the whole delivery process as smooth and efficient as possible. We're happy to work with you or your freight forwarder to make sure we meet all your needs when it comes to logistics, paperwork, and scheduling. If you have specific instructions for how you want your goods handled, we'll do our best to make it happen. We're all about making sure you get what you need, when you need it. So, whether it's port delivery or factory loading, we've got you covered. Just let us know what works best for you, and we'll take care of the rest. We're committed to getting your goods to you safely and on time, every time.


Payment & Shipping Terms

We‍‌‍‍‌ make sure our clients feel comfortable and satisfied through our flexible payment and delivery arrangements so that their worldwide orders become really smooth.

In terms of trade conditions:

We can work to the most universally accepted commercial practices, thus meeting your requirements as well as your understanding of risks in your business. All of the following conditions below are considered as acceptable ones:

• FOB Free On Board

• CFR (Cost and Freight)

• CIF (Cost, Insurance and Freight)

If you have specific conditions in mind that differ from the above, feel free to let us know and we will definitely entertain the discussion.

Time of Manufacturing:

Production of your order will take about 45 days under our usual terms after the confirmation of the order and the payment deposit. Throughout this time, all steps will be completed from the preparation of materials till the factory inspection. To get your orders earlier, we may even provide a faster solution—for the feasibility discussion and the adjustment possibilities, contact us.

Packaging:

To avoid the damages during transport, the goods are kept as safe as possible. We are using strong steel racks and wooden shipping crates which are packed well for protection from handling and the rough conditions at sea under standard export packaging. We have a complete range from simple to complicated and can do whatever you request so if you have any specific requirement or drawing for the packaging, please let us ‍‌‍‍‌know.


Certificate of Autuority to use the Official API Monogram
Certificate of Autuority  to use the Official API Monogram
National Level II laboratory
National Level II laboratory
MineExpo 2021- Las Vegas
MineExpo 2021- Las Vegas
Wha's your quote time?
Can I come and visit you?
FOB, CFR, CIF TERMS ,monthly supply
FOB, CFR, CIF TERMS ,monthly supply
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right