4330v Forged Vavle Pump Body For Oil Equipment
- HHF
- HENAN
- 45DAYS
- 200pcs per month
Quality first is our principle.
HHF has been certified by API Q1 Quality Management System.
Customers are very satisfied with our high quality. Our technologists can design the drawings as per customers' requirements.
Product Introduction
4330v Forged Vavle Pump Body For Oil Equipment

Pump head body
Smelting chemical composition of steel
Grade | C | Si | Mn | P | S | Ni | Cr | Mo | V | Cu | Nb |
25Cr2Ni4MoV | 0.24 ~ 0.30 | 0.15 ~ 0.30 | ≤ 0.50 | ≤ 0.015 | ≤ 0.015 | 3.50 ~ 4.00 | 1.40 ~ 2.00 | 0.30 ~ 0.60 | 0.08 ~ 0.15 | ≤ 0.20 | / |
30CrNi2MoV | 0.28 ~ 0.33 | 0.15 ~ 0.33 | 0.50~ 0.80 | ≤ 0.015 | ≤ 0.015 | 2.40 ~ 2.70 | 0.90 ~ 1.10 | 0.40 ~ 0.55 | 0.06 ~ 0.12 | ≤ 0.20 | / |
30CrNi3MoV | 0.26 ~ 0.33 | 0.15 ~ 0.35 | 0.30~ 0.90 | ≤ 0.015 | ≤ 0.015 | 2.80 ~ 3.30 | 0.80 ~ 1.50 | 0.40 ~ 0.60 | 0.06 ~ 0.25 | ≤ 0.20 | / |
17-17PH ( Stainless steel) | ≤ 0.07 | ≤ 1.00 | ≤ 1.00 | ≤ 0.025 | ≤ 0.010 | 3.50-5.00 | 15.00-17.50 | / | / | 3.00-5.00 | 0.15-0.45 |
Mechanical properties should meet
Grade | Yield Strength Rp0.2(M p a) | tensile strength Rm(M p a) | Elongation A(%) | Shrinkage rate Z(%) | Charpy impact energy AKV2( J) | Reference hardness ( HB ) | |
20 ℃ | -40 ℃ | ||||||
25Cr2Ni4MoV | ≥ 1050 | ≥ 1120 | ≥ 12 | ≥ 35 | Single value ≥ 33 | Average ≥26 | 305-380 |
Single value≥20 | |||||||
30CrNi2MoV | ≥ 880( longitudinal ) | ≥ 1020 ( longitudinal ) | ≥ 12 | ≥ 35 | Average value ≥ 42 | Average value ≥ 34 | 280-360 |
≥ 860( horizontal ) | ≥ 960 ( horizontal ) | Single value≥34 | Single value ≥27 | ||||
30CrNi3MoV | ≥ 900 ( longitudinal ) | ≥ 1050 ( longitudinal ) | ≥ 14 | ≥ 35 | Average value ≥ 42 | Average value ≥ 34 | 290-360 |
≥ 880( horizontal ) | ≥ 1000 ( horizontal ) | Single value≥34 | Single value ≥27 | ||||
17-17PH ( Stainless steel) | ≥ 900 | ≥ 1000 | ≥ 14 | / | Single value ≥ 18 | / | / |
About Us
Henan Zhongyuan Heavy Forging Co., Ltd. (HHF) is a national high-tech enterprise. There are four production branches for forging, heat treatment, petroleum equipment, and mechanical processing, a provincial oil drilling tool stabilizer engineering technology research center, a physical and chemical laboratory, and a municipal technology research and development center. The company is an American API Q1 quality system certification and API 7-1 drill stabilizer drill collar logo certification enterprise, and it has obtained CSSC quality system certification and ISO 9001:2008, ISO/TS29001 international quality system certification.
The factory is about 150 mu large, equivalent to 100,000 square meters. At the company's production base, there are 3 sets of the factory-style drop forging lines on a large scale (with the basic equipment being a 10,000 ton hydraulic press), 2 advanced mold forging production lines and some big CNC machining centers, heat treating lines, the laboratory of second class national system is quite well equipped too.
About 500 employees are engaged by the company at the moment out of which more than 50 are dedicated researchers who, with their high-level engineers and technical specialists are engaged in the development of new materials, methods and technologies.
The company's products have reached customers in more developed markets, as we've exported our goods to more than 20 countries and regions, such as Germany, the United States, Australia, India, Russia, Brazil, South Africa, South Korea, and Japan. The world is our stage!
FAQ
1. How soon would you give the quotation?
In general, it is up to three days. We just need to find out your needs and main sizes.
2. How do you assure the quality?
A. We have a quality control department. B. We shall carry out one sample run and another small batch production run after the first sample order before the mass order.
3.Can I come and visit you?
Yes, of course. We are pleased to welcome you to visit our company and discuss technical details and requirements with our team.
4.What's the production lead time?
Our pruction progress is from forging, rough machining ,Q+T to final machining.Itis usually 45days.
5.what are your payment terms?
We typically ask for 30% down payments to launch production, 70% balance before delivering goods.




